Process
16318
page-template,page-template-full_width,page-template-full_width-php,page,page-id-16318,bridge-core-3.1.0,qode-page-transition-enabled,ajax_fade,page_not_loaded,,qode-title-hidden,qode-theme-ver-29.9,qode-theme-bridge,wpb-js-composer js-comp-ver-7.0,vc_responsive

Our Process

There are two paths you can take depending on your lot selection 1) Custom Lots  OR  2) Designed Lots. The process for each is outlined below.

CUSTOM LOTS

Lots 36 – 43

FIRST

Review our DESIGN GUIDELINES.

SECOND

Choose a lot you love.

THIRD

Secure the lot by writing an offer to purchase.

FOURTH

Take 60 days to determine whether the lot meets the needs for your home design and price points. We can point you to our preferred builders/architects to help with this process or choose your own.

FIFTH

If you decide to proceed after 60 days, closing on the lot will happen upon City of Middleton sign off of Belle Farm Infrastructure (anticipated summer of 2024) and seller’s recording of the Phase 1 Final Plat and Covenants.

SIXTH

After close, your builder will be able to pull a building permit and start construction of your beautiful new Belle Farm home.

DESIGNED LOTS

Lots 4-22, 24-35, 44-51

FIRST

Review our Design Guidelines.

SECOND

Choose a lot with a corresponding home type that you love. (See color coded plat and House Descriptions.)

THIRD

Secure the lot by writing an offer to purchase.

FOURTH

We will provide a schematic design of your home within 30 days of Accepted Offer to Purchase. (We are currently designing each home with a mountain of intention. Once we receive an accepted offer to purchase, we will bump your home to the top of the list.)

FIFTH

Upon your receipt of the schematic design, take 60 days to review and to ensure the lot and home design meets your needs and price points. We can point you to our preferred builders/architects to help with this process or choose your own. Thus we provide you with an approved schematic design of the exterior and floor plans. You then work with your architect or builder to assess the design, flesh out interior choices, and determine pricing. The design contingency in the Offer to Purchase must be removed after 60 days.

SIXTH

If desired, you can modify the interior layouts/design. However the intent is for the exterior to follow the schematic design. Any requested changes to the exterior must comply with Belle Farm’s Design Guidelines and needs to be reviewed and approved by the Design Review Board — such review of requested changes will be at a rate of $150/hour.

SEVENTH

If you decide to proceed after your 60 day review period, closing on the lot will happen upon city of Middleton sign off of Belle Farm infrastructure (anticipated summer of 2024) and seller’s recording of the Phase 1 Final Plat and Covenants.

EIGTH

After close, your builder will be able to pull a building permit and start construction of your beautiful new Belle Farm home.

READY TO START?

Belle Farm Chicago Row House
Chicago Row House #3 at Belle Farm
Belle Farm Phase 1 Map
Graber Pond

CONTACT US